Your new Pierce apparatus is now in production at the Bradenton Florida facility. This week the cab began fabrication. Next week the cab should continue with fabrication and the chassis frame may arrive. The pump house structure may be fabricated and the fire pump may arrive. The body may begin fabrication.  